Quantity Take-off Worksheet

Concrete Material Estimator

Programmed by Rey Asuncion (Rox Isabela) (Copyright 2026)

This Concrete Material Estimator is done with reference from the book of Max Fajardo's Simplified Construction Estimate.

Project Name
Date
Estimate Prepared by:
Cement Bag
Saves everything on this worksheet to a file on your device, so you can reopen it later.

Concrete Works

Footings, columns, beams, slabs — volume method. Fill in the sizes and click "Add Member" to add it to the take-off below.

Table 1-2 · Concrete Proportion
New Entry
Members Added
No entries yet — fill in the form above and click "+ Add Member".

CHB Masonry Wall

Wall area, block count, and mortar for block laying (with optional plaster on 1 or 2 faces).

Table 2-2 & 2-4 · CHB Mortar / Plaster
New Entry
Walls Added
No entries yet — fill in the form above and click "+ Add Wall".

Plastering (Concrete Surfaces)

For plaster on concrete walls, ceilings or slabs — not part of a CHB wall entry above.

Table 2-4 · Plaster per m²
New Entry
Surfaces Added
No entries yet — fill in the form above and click "+ Add Surface".

Reinforcing Steel

Rebar weight by diameter, cut length and piece count, using the standard deformed-bar formula (D²/162 kg per meter). Commercial bars are ordered in fixed stock lengths, so cut pieces are converted to standard bars needed.

Unit Weight = D² ÷ 162
Standard commercial bar length: m used to convert cut lengths into stock bars to order
New Entry
Bar Entries Added
No entries yet — fill in the form above and click "+ Add Bar Entry".

Miscellaneous Cost

Direct cost items priced right in the entry — scaffolding, labor lump sums, equipment rental, or anything not covered by the material tables above. Cost = Size × Quantity × Unit Price (e.g. 50 kg per bundle × 10 bundles × price/kg). Leave Size blank to skip it and price by Quantity × Unit Price alone.

Priced per entry
New Entry
Items Added
No entries yet — fill in the form above and click "+ Add Item".

Work Procedures

Document the construction method and sequence of work — one step per entry, numbered in order. Edits update a step in place; new steps are added to the end.

New Step
Sequence of Work
No steps yet — fill in the form above and click "+ Add Step".

Specifications

Reference tables and mixture standards this worksheet calculates from, plus space for your own project notes.

Fajardo · Simplified Construction Estimate

Table 1-2 — Concrete Proportion (per m³)

ClassMixture RatioCement (40kg bags)Cement (50kg bags)Sand (m³)Gravel (m³)Typical Use
AA1 : 1½ : 312.09.50.501.0Water-retaining structures, precast, heavy-duty slabs
A1 : 2 : 49.07.00.501.0Footings, columns, beams, slabs — general RC works
B1 : 2½ : 57.56.00.501.0Wall footings, sidewalks, low-stress slabs
C1 : 3 : 66.05.00.501.0Lean concrete, fill, non-structural works

Table 2-2 — CHB Mortar for Block Laying (per m² of wall)

CHB SizePcs / m²Cement Class A (bags)Class B (bags)Class C (bags)Class D (bags)Sand (m³)
10 x 20 x 40 cm (4 in)12.50.7920.5220.3940.3280.0435
15 x 20 x 40 cm (6 in)12.51.5261.0180.7630.6330.0844
20 x 20 x 40 cm (8 in)12.52.2601.5001.1250.9380.1250

Table 2-4 — Plaster per m² by Thickness

ThicknessClass A (bags)Class B (bags)Class C (bags)Class D (bags)Sand (m³)
8 mm0.1440.0960.0720.0600.008
12 mm0.2160.1440.1080.0900.012
16 mm0.2880.1920.1440.1200.016
20 mm0.3600.2400.1800.1500.020
25 mm0.4500.3000.2250.1880.025

Mortar Mixture Classes (general 1:X mixes)

ClassRatioCement (40kg bags/m³)Sand (m³/m³)
A1 : 218.01.0
B1 : 312.01.0
C1 : 49.01.0
D1 : 57.51.0

Reinforcing Steel — Unit Weight Formula

Standard deformed round bar weight: W (kg/m) = D² ÷ 162, where D is the nominal bar diameter in millimeters. This is the industry-standard approximation derived from steel density (7,850 kg/m³) and is independent of bar grade.

Project Specifications / Notes

Pricing

Enter unit prices to cost out the material take-off computed in the other tabs.

Applies waste % from Summary
Unit Prices
Reinforcing Steel — Price per Size
Tie Wire

Cost Estimate

For Estimate
MaterialQuantityUnit PriceExtended Cost
VAT / sales tax: % applied to the subtotal below
Subtotal
0.00 SAR
VAT
0.00 SAR
Grand Total
0.00 SAR

Project Summary

Combined totals and itemized take-off across all worksheet tabs.

Waste / contingency allowance: % applied to cement, sand & gravel totals

Material Take-off

For Estimate
Cement
0 bags
Sand
0
Gravel
0
CHB Blocks
0 pcs
Reinforcing Steel
0 kg
SourceCement (bags)Sand (m³)Gravel (m³)
Reinforcing Steel — by DiameterWeight (kg)Total Length (m)Stock Bars